AQW 17432/17-22 Written question to the Minister for Infrastructure
To ask the Minister for Infrastructure to detail (i) the cycle routes delivered under road improvement and resurfacing schemes by Roads Eastern Division in each of the last five years; and (ii) a summary of the number of schemes and length broken down by facility type as defined in departmental guidance "Measures to regulate traffic RSPPG E063" (a) totally separate facility; (b) cycle lane on the carriageway; and (c) share walking/cycling facility.
Asked by Andrew Muir MLA on 15 April 2021
- Answered
- Written
- Tabled
- 15 April 2021
- Answer due by
- 30 April 2021
- Answered
- 23 April 20218 days after tabling
- Department
- Department for Infrastructure
- Priority question
- No
Answer
Details of the cycling facilities that have been constructed by my Department within Roads Eastern Division in the previous 5 years, by facility type, are provided in the following table:
| Year | Scheme Name | Type of cycling facility provided | Length (KM) |
| 2020-21 | Blaris Greenway Phase 3 | Greenway | 1.4km |
| Dublin Road | Pop Up | 0.63km | |
| Grosvenor Road | Pop Up | 0.55km | |
| Crumlin Road | Pop Up | 1.0km | |
| Donegall Road | Pop Up | 0.80km | |
| A55 Knock Road / Glen Rd | Crossing | - | |
| 2019-20 | Broadway | Shared | 0.12km |
| Blaris Greenway Phase 1 / 2 | Greenway | 1.4km | |
| 2018-19 | Middlepath Street | Two-way | 0.37km |
| Middlepath Street | Shared | 0.15km | |
| Middlepath Street | Two-way | 0.29km | |
| Comber Greenway (Comber Rd /Old Dundonald Greenway included) | Greenway | 2.4km | |
| Laurelhill Road | Shared | 1.2km | |
| 2017-18 | Castledillon | Shared | 0.05km |
| Comber Greenway | Greenway | 4.8km | |
| 2016-17 | College Sq North | Two-way | 0.19km |
| College Sq North | Shared | 0.06km | |
| Durham St | Two-way & Shared | 0.15km | |
| Durham St | Shared | 0.07km | |
| College Ave to Castle Street | Contraflow | 0.13km | |
| Total length (KM) | 15.76km |