To ask the Minister for Infrastructure to detail (i) the cycle routes delivered under road improvement and resurfacing schemes by Roads Eastern Division in each of the last five years; and (ii) a summary of the number of schemes and length broken down by facility type as defined in departmental guidance "Measures to regulate traffic RSPPG E063" (a) totally separate facility; (b) cycle lane on the carriageway; and (c) share walking/cycling facility.

Asked by Andrew Muir MLA on 15 April 2021

  • Answered
  • Written
Tabled
15 April 2021
Answer due by
30 April 2021
Answered
23 April 20218 days after tabling
Department
Department for Infrastructure
Priority question
No

Answer

Details of the cycling facilities that have been constructed by my Department within Roads Eastern Division in the previous 5 years, by facility type, are provided in the following table:

YearScheme NameType of cycling facility providedLength (KM)
2020-21Blaris Greenway Phase 3Greenway1.4km
Dublin RoadPop Up0.63km
Grosvenor RoadPop Up0.55km
Crumlin RoadPop Up1.0km
Donegall RoadPop Up0.80km
A55 Knock Road / Glen RdCrossing-
2019-20BroadwayShared0.12km
Blaris Greenway Phase 1 / 2Greenway1.4km
2018-19Middlepath StreetTwo-way0.37km
Middlepath StreetShared0.15km
Middlepath StreetTwo-way0.29km
Comber Greenway (Comber Rd /Old Dundonald Greenway included)Greenway2.4km
Laurelhill RoadShared1.2km
2017-18CastledillonShared0.05km
Comber GreenwayGreenway4.8km
2016-17College Sq NorthTwo-way0.19km
College Sq NorthShared0.06km
Durham StTwo-way & Shared0.15km
Durham StShared0.07km
College Ave to Castle StreetContraflow0.13km
Total length (KM)15.76km